Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
projects:maint-2024 [2024/08/22 18:16] dutran |
projects:maint-2024 [2024/09/11 11:45] (current) dutran [Nexus Core switch firmware update] |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== 2024 ICS Maintenance Schedule ====== | ====== 2024 ICS Maintenance Schedule ====== | ||
- | ==== Nexus Core switch configuration change ==== | + | ==== Nexus Core switch (3 of 3) firmware update ==== |
+ | |||
+ | * Date: Monday 9/16 at 7:30am | ||
+ | * Duration: 30 minutes (could be longer) | ||
+ | * Affects: | ||
+ | * SSH Sessions on addison-v4 (staff/faculty ssh server) | ||
+ | * DUO authentication for ICS Gmail | ||
+ | * Samba connections | ||
+ | * SLURM job submissions | ||
+ | ==== Nexus Core switch (2 of 3) firmware update ==== | ||
+ | |||
+ | * Date: Monday 9/9 at 7:30am | ||
+ | * Duration: 30 minutes (could be longer) | ||
+ | * Affects: | ||
+ | * MySQL servers | ||
+ | * WordPress sites | ||
+ | * Slurm job submissions | ||
+ | * ICS Helpdesk | ||
+ | * Gitlab | ||
+ | |||
+ | ==== Nexus Core switch (1 of 3) firmware update ==== | ||
* Date: 8/26 at 7:30am | * Date: 8/26 at 7:30am | ||
- | * Duration: 30 hour (could be longer) | + | * Duration: 30 minutes (could be longer) |
* Affects: | * Affects: | ||
* SSH Sessions on rockford-v1 (staff/faculty ssh server) | * SSH Sessions on rockford-v1 (staff/faculty ssh server) |