Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:maint-2024 [2024/08/22 18:16]
dutran
projects:maint-2024 [2024/09/11 11:45] (current)
dutran [Nexus Core switch firmware update]
Line 1: Line 1:
 ====== 2024 ICS Maintenance Schedule ====== ====== 2024 ICS Maintenance Schedule ======
  
-==== Nexus Core switch ​configuration change ​====+==== Nexus Core switch ​(3 of 3) firmware update ==== 
 + 
 +  * Date: Monday 9/16 at 7:30am 
 +  * Duration: 30 minutes (could be longer) 
 +  * Affects:  
 +    * SSH Sessions on addison-v4 (staff/​faculty ssh server) 
 +    * DUO authentication for ICS Gmail 
 +    * Samba connections 
 +    * SLURM job submissions 
 +==== Nexus Core switch (2 of 3) firmware update ==== 
 + 
 +  * Date: Monday 9/9 at 7:30am 
 +  * Duration: 30 minutes (could be longer) 
 +  * Affects:  
 +    * MySQL servers  
 +    * WordPress sites 
 +    * Slurm job submissions 
 +    * ICS Helpdesk 
 +    * Gitlab 
 + 
 +==== Nexus Core switch (1 of 3) firmware update ​====
  
   * Date: 8/26 at 7:30am   * Date: 8/26 at 7:30am
-  * Duration: 30 hour (could be longer)+  * Duration: 30 minutes ​(could be longer)
   * Affects: ​   * Affects: ​
     * SSH Sessions on rockford-v1 (staff/​faculty ssh server)     * SSH Sessions on rockford-v1 (staff/​faculty ssh server)
projects/maint-2024.1724375802.txt.gz · Last modified: 2024/08/22 18:16 by dutran
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0