projects:maint-2024 [2024/09/11 11:38]
dutran [Nexus Core switch configuration change]
projects:maint-2024 [2024/09/11 11:45] (current)
dutran [Nexus Core switch firmware update]
Line 1: Line 1:
 ====== 2024 ICS Maintenance Schedule ====== ====== 2024 ICS Maintenance Schedule ======
  
-==== Nexus Core switch firmware update ====+==== Nexus Core switch ​(3 of 3) firmware update ====
  
   * Date: Monday 9/16 at 7:30am   * Date: Monday 9/16 at 7:30am
   * Duration: 30 minutes (could be longer)   * Duration: 30 minutes (could be longer)
   * Affects: ​   * Affects: ​
-    * MySQL servers ​ +    * SSH Sessions on addison-v4 (staff/​faculty ssh server) 
-    * WordPress sites +    * DUO authentication for ICS Gmail 
-    * Slurm job submissions +    * Samba connections 
-    * ICS Helpdesk +    * SLURM job submissions 
-    * Gitlab +==== Nexus Core switch ​(2 of 3) firmware update ====
- +
-==== Nexus Core switch firmware update ====+
  
   * Date: Monday 9/9 at 7:30am   * Date: Monday 9/9 at 7:30am
Line 23: Line 21:
     * Gitlab     * Gitlab
  
-==== Nexus Core switch ​configuration change ​====+==== Nexus Core switch ​(1 of 3) firmware update ​====
  
   * Date: 8/26 at 7:30am   * Date: 8/26 at 7:30am
projects/maint-2024.1726079918.txt.gz · Last modified: 2024/09/11 11:38 by dutran
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0