Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:maint-spring-2018 [2018/04/12 16:29]
dutran [Mail server migration]
projects:maint-spring-2018 [2021/06/15 10:41] (current)
wdcohen
Line 1: Line 1:
-====== Spring Quarter ​2018 Maintentance ​Events ======+====== ​2018 Spring Quarter ​Maintenance ​Events ======
  
  
Line 8: Line 8:
  
 ====Summer Break Maintenance==== ====Summer Break Maintenance====
-  * Date:  6/19/2018+  * Date:  6/18/2018
   * Time:  All Day   * Time:  All Day
  
-=== IGB Operating System ​Maintenance ===+=== IGB and Instructional OS Maintenance ===
  
-**Affected Hosts**: ​ All IGB Computing Hosts+**Affected Hosts**: ​ All IGB Computing Hosts and ll instructional computing hosts
  
-**Reason**: ​  ​Installation of the latest kernel and security patches ​that include ​mitigation for the Meltdown and Spectrev1 ​vulnerabilities.+**Reason**: ​  ​Installation of the latest kernel and security patches.  Includes ​mitigation for the Meltdown and Spectre and Meltdown ​vulnerabilities.
  
 **Impact**:  ​ **Impact**:  ​
-  * **ALL** IGB managed hosts in the affected groups will receive the latest OS patches. +  * **Most** IGB managed hosts in the affected groups will receive the latest OS patches. 
-  * **ALL** IGB hosts will be rebooted.+  * **Most** IGB hosts will be rebooted
 +  * Hosts in the benzene cluster and dover-1 and dover-2 will be defered until after 1pm 
 +  * The Arcus cluster will be updated and reboot on Tuesday morning, 6/26 and new CUDA installed. 
 +  * Instructional hosts will be rebooted 
 + 
 +=== Cisco Switch Power switchover === 
 + 
 +**Affected Hosts**: ​ richard-castle,​ dover-1, dover-2, adrian-monk,​ tiamat, odin, disney, christopher-eccleston,​ liz-shaw, tom-baker, addison 
 + 
 +**Reason**: ​  Cisco switch is currently on a redundant power supply. ​ When the RPS is turned off, it is expected for the Cisco switch to cut over to the main power. 
 + 
 +**Impact**: ​ All the hosts listed will lose network connection if the Cisco switch doesn'​t switch over to the main power as expected. ​ Network connection should be back online in about 10 minutes. 
 + 
 +=== MySQL Server Outage === 
 + 
 +**Time:​** ​ 0700 
 + 
 +**Duration:​** 30 minutes 
 + 
 +**Affected Hosts:​** ​ mysql0.ics.uci.edu 
 + 
 +**Reason:​** ​ This is being done in order to make a new slave to the master MySQL server. 
 + 
 +**Impact:** Services dependent on central database server will be unavailable. ​ This includes most ICS web apps. 
 + 
 +=== GitLab Server Outage === 
 + 
 +**Time:​** ​ 0800 
 + 
 +**Duration:​** 8 Hours 
 + 
 +**Affected Hosts:​** ​ gitlab.ics.uci.edu (rockford-v3.ics.uci.edu) 
 + 
 +**Reason:​** ​ Upgrade Gitlab to the version 11.2.3. 
 + 
 +**Impact:​** ​ Gitlab functions will be unavailable intermittently during the upgrade.  
 + 
 +==== Mail Scanner Updates ==== 
 + 
 +**SYSTEM:** ICS MailScanner 
 + 
 +**DATE:** 6/13/2018 
 + 
 +**REASON:** Email service mail scanners are superior and more consistently maintained than ICS mail scanners.  
 + 
 +**AFFECTS:​** ​ Email messages recieved by ICS that are forwarded onto another email service, including ICS Gmail, will no longer be scanned.
  
 ==== Hitachi Fiber Upgrade ==== ==== Hitachi Fiber Upgrade ====
projects/maint-spring-2018.1523575799.txt.gz · Last modified: 2018/04/12 16:29 by dutran
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0