Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:maint-spring-2018 [2018/06/12 11:33]
Hans [Summer Break Maintenance]
projects:maint-spring-2018 [2021/06/15 10:41] (current)
wdcohen
Line 1: Line 1:
-====== Spring Quarter ​2018 Maintentance ​Events ======+====== ​2018 Spring Quarter ​Maintenance ​Events ======
  
  
Line 11: Line 11:
   * Time:  All Day   * Time:  All Day
  
-=== IGB Operating System ​Maintenance ===+=== IGB and Instructional OS Maintenance ===
  
-**Affected Hosts**: ​ All IGB Computing Hosts, All instructional computing hosts+**Affected Hosts**: ​ All IGB Computing Hosts and ll instructional computing hosts
  
-**Reason**: ​  ​Installation of the latest kernel and security patches ​that include ​mitigation for the Meltdown and Spectre and Meltdown vulnerabilities.+**Reason**: ​  ​Installation of the latest kernel and security patches.  Includes ​mitigation for the Meltdown and Spectre and Meltdown vulnerabilities.
  
 **Impact**:  ​ **Impact**:  ​
-  * **ALL** IGB managed hosts in the affected groups will receive the latest OS patches. +  * **Most** IGB managed hosts in the affected groups will receive the latest OS patches. 
-  * **ALL** IGB hosts will be rebooted.+  * **Most** IGB hosts will be rebooted
 +  * Hosts in the benzene cluster and dover-1 and dover-2 will be defered until after 1pm 
 +  * The Arcus cluster will be updated and reboot on Tuesday morning, 6/26 and new CUDA installed.
   * Instructional hosts will be rebooted   * Instructional hosts will be rebooted
  
Line 30: Line 32:
 **Impact**: ​ All the hosts listed will lose network connection if the Cisco switch doesn'​t switch over to the main power as expected. ​ Network connection should be back online in about 10 minutes. **Impact**: ​ All the hosts listed will lose network connection if the Cisco switch doesn'​t switch over to the main power as expected. ​ Network connection should be back online in about 10 minutes.
  
-=== MySQL Server Outage ===\+=== MySQL Server Outage ===
  
 **Time:​** ​ 0700 **Time:​** ​ 0700
 +
 **Duration:​** 30 minutes **Duration:​** 30 minutes
  
Line 40: Line 43:
  
 **Impact:** Services dependent on central database server will be unavailable. ​ This includes most ICS web apps. **Impact:** Services dependent on central database server will be unavailable. ​ This includes most ICS web apps.
 +
 +=== GitLab Server Outage ===
 +
 +**Time:​** ​ 0800
 +
 +**Duration:​** 8 Hours
 +
 +**Affected Hosts:​** ​ gitlab.ics.uci.edu (rockford-v3.ics.uci.edu)
 +
 +**Reason:​** ​ Upgrade Gitlab to the version 11.2.3.
 +
 +**Impact:​** ​ Gitlab functions will be unavailable intermittently during the upgrade. ​
 +
 +==== Mail Scanner Updates ====
 +
 +**SYSTEM:** ICS MailScanner
 +
 +**DATE:** 6/13/2018
 +
 +**REASON:** Email service mail scanners are superior and more consistently maintained than ICS mail scanners. ​
 +
 +**AFFECTS:​** ​ Email messages recieved by ICS that are forwarded onto another email service, including ICS Gmail, will no longer be scanned.
  
 ==== Hitachi Fiber Upgrade ==== ==== Hitachi Fiber Upgrade ====
projects/maint-spring-2018.1528828439.txt.gz · Last modified: 2018/06/12 11:33 by Hans
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0