This is an old revision of the document!
Maintenance Notifications Spring 2020
Downtime Notice: Hosts in Rack A05
- Date: 6/11/2020
- Start Time: 1030
- Duration: Approximately 2 hours
- Reason: Replacing a UPS
- Affects: The network switch needs to be rebooted twice as it will lose power during the UPS replacement, once before and once after. The following hosts and services will be temporarily lose networking connection for about 3-5 minutes each time the switch gets rebooted:
- centaurus-1
- Puppet server - castle-v0
- ganglia - castle-v1
- ns1 - castle-v2
- License - castle-v3
- Samba1 - castle-v4
- Loghost0 - castle-v5
- Mysql5 - castle-v7
- Dover-1
- Dover-2
- Sm0 - monk-v1
- Cron-server - monk-v2
- mta3/smtp0 - monk-v3
- Zuul - monk-v4
- Tiamat
- Odin
- Rodeo
- Disney
- Altair - windows domain controller
- Masterhit
- Liz-shaw - haproxy server
- Backup dhcp server - tom-v0
- Dcim - tom-v1
- Phoneagent - tom-v2
- Slurm-master0 addison-v9
- Ldap1 - addison-v0
- Vpn000 - addison-v2
- Imap1 - addison-v3
- Emp7-1 addison-v4
- Lbnamed - addison-v5
- Checkmate - addison-v6