Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
projects:maint-summer-2018 [2018/08/29 13:36] Hans [Odin Emergency Maintenance] |
projects:maint-summer-2018 [2018/09/14 10:50] (current) hans [Summer Quarter Maintenance] |
||
---|---|---|---|
Line 5: | Line 5: | ||
[[https://calendar.google.com/calendar/embed?src=ics.uci.edu_rbt2q6kmhapqm4bjaet1j48h00@group.calendar.google.com&ctz=America/Los_Angeles|ICS Computing Support Maintenance Calendar]] | [[https://calendar.google.com/calendar/embed?src=ics.uci.edu_rbt2q6kmhapqm4bjaet1j48h00@group.calendar.google.com&ctz=America/Los_Angeles|ICS Computing Support Maintenance Calendar]] | ||
- | ====Fall Quarter Maintenance==== | + | ====Summer Quarter Maintenance==== |
- | Fall quarter Maintenance has been schedule for 9/17/2018. Please check the [[projects:maint-summer-2018|Summer Maint. website]] for updates. Send email ot helpdesk@ics.uci.edu to have maintenance rescheduled. | + | Fall quarter Maintenance has been schedule for 9/17/2018. Please check the [[projects:maint-summer-2018|Summer Maint. website]] for updates. Send email to helpdesk@ics.uci.edu to have maintenance rescheduled. |
* Date: 9/17/2018 | * Date: 9/17/2018 | ||
* Time: All Day | * Time: All Day | ||
- | === Network Switch reboot === | + | === Network Switch Firmware Update and Reboot === |
**Affected Hosts:** Large number of ICS Hosts | **Affected Hosts:** Large number of ICS Hosts | ||
Line 18: | Line 18: | ||
**Reason:** Switch unresponsive to remote logins. | **Reason:** Switch unresponsive to remote logins. | ||
- | **Impact:** This switch provides network connections along with a 2nd switch for a large number of servers. During the reboot, the network connection could be disrupted for 30 seconds to 1 minute. There is no long anticipated downtime with this reboot. | + | **Impact:** These switches provide network connection for a large number of servers. As the firmware update occurs, except network interruptions of up to 1 hour. If you have a server that needs uninterrupted network connection, please email helpdesk@ics.uci.edu with the server name and the reason. |
=== Relocate john-luther to Critical Rack Cluster === | === Relocate john-luther to Critical Rack Cluster === | ||
Line 31: | Line 31: | ||
**Impact**: | **Impact**: | ||
* gitlab will be unavailable during this period. | * gitlab will be unavailable during this period. | ||
+ | |||
+ | === Pedigree/Beem systems to new power === | ||
+ | |||
+ | **Affected Hosts**: | ||
+ | * Pedigree cluster | ||
+ | * Beem2 and Beem3 | ||
+ | |||
+ | **Reason**: Relocating power to 110V to free up power needed for another project. | ||
+ | |||
+ | **Impact**: The server will be turned off for about 10-15 minutes while power is rerouted. This will happen after the servers are patched. Rather than a reboot, a brief shutdown will occur instead. | ||
=== OS Maintenance === | === OS Maintenance === | ||
Line 71: | Line 81: | ||
The GitLab server will be updated to the latest security release, 11.1.2. | The GitLab server will be updated to the latest security release, 11.1.2. | ||
- | ====VirtualBox Upgrade==== | + | ===#68260 MySQL Server Maintenance === |
+ | |||
+ | * SYSTEM: melvil-dewey-v0.ics.uci.edu | ||
+ | * DATE: September 17, 2018 | ||
+ | * START TIME: 0600 | ||
+ | * DURATION: 15 minutes | ||
+ | |||
+ | (Please note this is an estimate; systems may be up sooner or later | ||
+ | than expected, due to unforeseeable circumstances.) | ||
+ | |||
+ | ==AFFECTS:== | ||
+ | |||
+ | During this period the MySQL server will be unavailable. Any dependent websites, including https://www.ics.uci.edu, and applications will be unavailable. | ||
+ | |||
+ | |||
+ | ==REASON:== | ||
+ | |||
+ | A restart is required in order to limit the size of the ibtmp1 caching file. | ||
+ | |||
+ | ====VirtualBox 5.2.18 Upgrade #68338: ==== | ||
* SYSTEM: All ICS Systems | * SYSTEM: All ICS Systems | ||
- | * DATE: Sept 16, 2018 | + | * DATE: Sept 14, 2018 |
Affected Hosts: All ICS hosts | Affected Hosts: All ICS hosts | ||
Line 80: | Line 109: | ||
Reason: Upgrading to the latest version of Virtual Box on all ICS hosts between quarters. | Reason: Upgrading to the latest version of Virtual Box on all ICS hosts between quarters. | ||
- | Impact: Run VM's may require a restart. No other service outage anticipated. | + | Impact: Running VM's may require a restart. No other service outage anticipated. |
+ | |||
+ | |||
+ | ====Vagrant 2.1.4 Upgrade #68338: ==== | ||
+ | |||
+ | * SYSTEM: All ICS Systems | ||
+ | * DATE: Sept 14, 2018 | ||
+ | |||
+ | Affected Hosts: All ICS hosts | ||
+ | Reason: Upgrading to the latest version of Vagrant on all ICS hosts between quarters. | ||
+ | Impact: Running VM's may require a restart. No other service outage anticipated. | ||
====Odin Emergency Maintenance==== | ====Odin Emergency Maintenance==== | ||