Summer Quarter 2018 Maintentance Events

Calendar

Fall Quarter Maintenance

  • Date: 9/17/2018
  • Time: All Day

Relocate john-luther to Critical Rack Cluster

Affected Hosts:

  • john-luther.ics.uci.edu
  • ldap3.ics.uci.edu (john-luther-v0.ics.uci.edu)
  • gitlab.ics.uci.edu (john-luther-v1.ics.uci.edu)

Reason: Relocating server to rack with emergency power.

Impact:

  • gitlab will be unavailable during this period.

OS Maintenance

Affected Hosts: All ICS and IGB CentOS6/7 hosts.

Reason: Patching multiple critical vulnerabilities that can lead to loss of sensitive information and allow attackers to preform trivial DDOS exploits.

  • Kernel Side-Channel Attack using L1 Terminal Fault: CVE-2018-3620 and CVE-2018-3646
  • Segmentsmack TCP implementations vulnerable to Denial of Service: CVE-2018-5390

Impact:

Kernel packages updates are required to mitigate these vulnerabilities. New kernel packages will be installed to all CentOS6/7 followed by a reboot to load the new kernel.

If this downtime would cause hardship for your research, please send mail to helpdesk@ics.uci.edu to setup an alternate schedule.

KEA DHCPD Server Release

Affected Hosts: ICS Hosts using DHCP

Reason: Upgrading to ISC KEA DHCP Server.

Impact: Clients should not experience any interuption in service.

Gitlab Server Downtime

  • SYSTEM: Gitlab Server
  • DATE: September 17, 2018
  • START TIME: 0800
  • DURATION: 2 hours

(Please note this is an estimate; systems may be up sooner or later than expected, due to unforeseeable circumstances.)

AFFECTS:

During this downtime window, the ICS Gitlab server will be unavailable.

REASON:

The GitLab server will be updated to the latest security release, 11.1.2.

projects/maint-summer-2018.1534877875.txt.gz · Last modified: 2018/08/21 11:57 by Hans
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0