2021 Winter Maintenance Schedule

ICS Server Update and Reboot Schedule

  • Downtime Notice: Patch and Reboot ICS Servers
  • Date: March 22nd through March 25th, 2021
  • Duration: Severs will be rebooted throughout the week. Servers providing critical services will be rebooted outside of normal work hours.

The following ICS servers will be updated and reboot at the times noted below:

Hostname Service Maint Window Begin Maint Window Duration
adrian-monk-v11.ics.uci.edu Puppet4 Configuration Server 3/22/2021-0900 2 hours
adrian-monk-v9.ics.uci.edu Nagios Monitoring 3/22/2021-900 2 hours
broadchurch-v1.ics.uci.edu Website: digphenotypes 3/22/2021-0900 2 hours
colin-baker-v0.ics.uci.edu Puppet6 Configuration Server 3/22/2021-0900 2 hours
colin-baker-v1.ics.uci.edu N/A 3/22/2021-0900 2 hours
colin-baker-v3.ics.uci.edu N/A 3/22/2021-0900 2 hours
columbo-v2.ics.uci.edu FTP Server (redundant) 3/22/2021-0900 2 hours
kate-beckett-v5.ics.uci.edu Mail Delivery (Redundant) 3/22/2021-0900 2 hours
melvil-dewey-v1.ics.uci.edu Helpdesk 3/22/2021-0900 2 hours
nancy-drew-v2.ics.uci.edu OS Provisioning 3/22/2021-0900 2 hours
nancy-drew-v4.ics.uci.edu Puppet Database 3/22/2021-0900 2 hours
richard-castle-v6.ics.uci.edu Helpdesk 3/22/2021-0900 2 hours
rockford-v2.ics.uci.edu LOM VPN 3/22/2021-0900 2 hours
rockford-v4.ics.uci.edu Mail Service: IMAP 3/22/2021-0900 2 hours
rockford-v6.ics.uci.edu Vault Secret Storage 3/22/2021-0900 2 hours
rockford-v8.ics.uci.edu Authentication Server 3/22/2021-0900 2 hours
sakura-v4.ics.uci.edu Logging: Logstash and Elk 3/22/2021-0900 2 hours
sasuke-v4.ics.uci.edu Metrics: Graphana 3/22/2021-0900 2 hours
kate-beckett-v3.ics.uci.edu Service host 3/22/2021-1700 2 hours
addison-v4.ics.uci.edu Staff/Faculty Cycle Service 3/22/2021-1700 2 hours
adrian-monk-v1.ics.uci.edu SGE Scheduler 3/22/2021-1700 2 hours
addison-v3.ics.uci.edu Mail Service: IMAP 3/22/2021-1700 2 hours
nancy-drew-v5.ics.uci.edu Mail Service: MailMan 3/22/2021-1700 2 hours
naruto-v4.ics.uci.edu Metrics: Prometheus Collection 3/22/2021-1700 2 hours
paul-mcgann-v0.ics.uci.edu SGE-Master 3/22/2021-1700 2 hours
richard-castle-v0.ics.uci.edu Puppet4 Configuration Server 3/22/2021-1700 2 hours
richard-castle-v1.ics.uci.edu Metrics: Ganglia 3/22/2021-1700 2 hours
richard-castle-v5.ics.uci.edu Logging: Syslog Aggregator 3/22/2021-1700 2 hours
rockford-v1.ics.uci.edu Staff/Faculty Cycler Server 3/22/2021-1700 2 hours
Hostname Service Maint Window Begin Maint Window Duration
addison-v9 slurm-master 3/22/2001-0900 2 hours
castle-v4 samba1 3/22/2001-0900 2 hours
jo-grant haproxy 3/22/2001-0900 2 hours
jodie-whittaker-v3 3/22/2001-0900 2 hours
peter-capaldi and its VMs web services 3/22/2001-0900 2 hours
tom-baker-v0 dhcp2 3/22/2001-0900 2 hours
tom-baker-v1 dcim 3/22/2001-0900 2 hours
tom-baker-v2 3/22/2001-0900 2 hours
liz-shaw haproxy 3/22/2001-1000 2 hours
kate-beckett-v0 samba2 3/22/2001-1000 2 hours
kate-beckett-v4 ns2 3/22/2001-1000 2 hours
nancy-drew-v3 phpadmin 3/22/2001-1000 2 hours
nancy-drew-v6 const-esports 3/22/2001-1000 2 hours
sylvester-mccoy-v0 dhcp1 3/22/2001-1000 2 hours
sylvester-mccoy-v1 3/22/2001-1000 2 hours
nancy-drew-v0 samba3 3/22/2001-1100 2 hours
richard-castle-v2 ns1 3/22/2001-1100 2 hours
matt-smith and its VMs web services 3/22/2001-1300 2 hours
addison-v5 lbnamed 3/25/2001-0900 2 hours
Hostname Service Maint Window Begin Maint Window Duration
richard-castle-v3 License Server 3/22/2001-0900 2 hours
adrian-monk-v2 Cron Server 3/22/2001-0900 2 hours
adrian-monk-v10 N/A 3/22/2001-0900 2 hours
kate-beckett-v6 N/A 3/22/2001-0900 2 hours
melvil-dewey-v2 Postgres Server 3/22/2001-0900 2 hours
rockford-v5 N/A 3/22/2001-0900 2 hours
rockford-v9 N/A 3/22/2001-0900 2 hours
rockford-v11 N/A 3/22/2001-0900 2 hours
rockford-v13 N/A 3/22/2001-0900 2 hours
rockford-v14 N/A 3/22/2001-0900 2 hours
rockford-v15 N/A 3/22/2001-0900 2 hours
rockford-v16 N/A 3/22/2001-0900 2 hours
columbo-v0 Mail Service: IMAP2 3/22/2001-0900 2 hours
columbo-v1 Logging: loghost1 3/22/2001-0900 2 hours
columbo-v3 N/A 3/22/2001-0900 2 hours
columbo-v4 N/A 3/22/2001-0900 2 hours
columbo-v5 N/A 3/22/2001-0900 2 hours
columbo-v6 N/A 3/22/2001-0900 2 hours
columbo-v7 N/A 3/22/2001-0900 2 hours
columbo-v11 N/A 3/22/2001-0900 2 hours
datalab-storage1 Data Storage Server 3/23/2001-0900 2 hours
kraken ZFS Server 3/23/2001-0900 2 hours
hayes20t ZFS Server 3/29/2001-0900 2 hours

Openlab Reboot

  • Downtime Notice: #78583: Patch and Reboot Openlab and Openlab8 Clusters
  • Date: March 25th , 2021
  • Duration: 4 hours, beginning at 0800

IMPACT: All openlab and Openlab8 hosts will be patched, rebooted and moved from the puppet4 to puppet6 configuration servers. The hosts will be unavailable via SSH, SGE and Slurm during this period. SGE and Slurm spools will be turned off at end of business on 3/24.

Kubernetes Cluster Upgrade

  • Downtime Notice: #78583: Upgrade Kubernetes Clusters
  • Date: March 22nd , 2021
  • Duration: All week beginning at 0600 and lasting approximately 8 hours

IMPACT: The Kubernetes clusters are built with redundant nodes so overall service should not be disrupted. Some users may notice pods or instances disconnecting and rebooting as they are migrating from one node to another.

Gitlab Upgrade

  • Downtime Notice: #78583: Upgrade Gitlab Server
  • Date: March 24nd , 2021
  • Duration: 0800 to 12:00

IMPACT: The site gitlab.ics.uci.edu will not be available during upgrade window. Repositories will not be available to push/pull from. This will not impact gitlab setup for individual classes.

Engineering Tower Generator ATS repair On Jan 30th

  • Downtime Notice: #78155 : ICS Data Center Power Event: Engineering Tower Generator ATS repair
  • Date: January 30th, 2020
  • Duration: Beginning at 0600 and lasting approximately 8 hours

Campus facilities scheduling an electrical power shut down for the ICS building on 1/30/2021 in order to effect repairs on a failed generator automatic transfer switch.   

Network: Power will be temporarily reconfigured to make sure all ICS network equipment remains powered during this period.

Computing: We do not anticipate downtime on any ICS computing during this period.

Environment: One of three 20 ton air conditioners will be unavailable during this period. Portable cooling units will be used to supplement the remaining air conditioners. If the portable cooling units prove unable to maintain a reasonable operating temperature we will begin shutting down non-critical infrastructure followed by hosts generated the greatest amount of heat (e.g. GPU clusters).

OIT: OIT will be mirroring our efforts to make sure that their equipment in the building is available during this period.

Although we will do our best to avoid downtime during this period, there are many factors that can intersect unexpectedly to cause an outage. Please send email to helpdesk@ics.uci.edu if you are concerned that this work will cause a hardship on your research and we will work with campus facilities to do our best to accommodate.

Last Quarter

projects/maint-winter-2021.txt · Last modified: 2021/06/15 10:42 by wdcohen
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0