Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:maint-winter-2020 [2020/02/28 10:28]
vipada
projects:maint-winter-2020 [2021/06/15 10:43] (current)
wdcohen
Line 1: Line 1:
-======Maintenance Notifications ​Winter 2020=====+======2020 Winter ​Maintenance Notifications===== 
 + 
 +===== Downtime Notice: Openlab Hermod/​Odin/​Velox ===== 
 + 
 +  * Date:  **3/​27/​2020** 
 +  * Start Time:  **0800** 
 +  * Duration: ​ **Approximately 2 hours** 
 +  * Reason: ​ **The latest security and kernel updates will be installed on each host.  After installation,​ hosts will be turned off for about one hour to rewire power and networking for the hosts. **   
 +  * Affects: ​ **All services on each host including SSHD, Slurm, and SGE.**
  
 ===== Downtime Notice: Openlab Circinus Hosts ===== ===== Downtime Notice: Openlab Circinus Hosts =====
Line 40: Line 48:
 ===== Downtime Notice: Cantor Storage Host ===== ===== Downtime Notice: Cantor Storage Host =====
  
-  * Date:  **3/20/2020**+  * Date:  **3/25/2020**
   * Start Time:  **0800**   * Start Time:  **0800**
   * Duration: ​ **Approximately 4 hours**   * Duration: ​ **Approximately 4 hours**
projects/maint-winter-2020.1582914516.txt.gz · Last modified: 2020/02/28 10:28 by vipada
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0